Filling and packing suites that pass GMPC audit — and look good enough to show your brand clients on a factory tour.
GMPC


| AREA | CLASS | KEY EQUIPMENT |
|---|---|---|
| Compounding | 300K | Purification AC, ozone water dosing |
| Filling | 100K (ISO 8) | HEPA outlets, pass boxes, AIS ionization |
| Inner packing | 100K | Air shower, hygiene line |
| Outer packing / store | — | Impact doors, scheduled ozone |
REFERENCE VALUES — FINAL DESIGN IS ENGINEERED TO YOUR PRODUCT AND AUDIT SCHEME.

Review food cleanroom planning and acceptance requirements
READ GUIDE →Define the technical requirements, responsible reviewers and acceptance records for your project.
ISO 22716 practice puts filling and inner packing at Class 100,000 (ISO 8), compounding at Class 300K. We map your exact product risk in the project review.
Yes — vision-panel corridors and tour routes are designed in from day one; several clients use their BESTCLEAN cleanroom as a sales tool.
Yes — ozone dosing systems with venturi mixers for process-water loops are part of our standard scope.
Around 30-45 days on site after a 2-3 week prefabrication window, depending on HVAC scope.
Send a floor plan, application and target conditions. Confirm the review scope, equipment requirements and quotation schedule.