REPLY < 24H MON–SAT · ISO 14644 · 200+ PROJECTS
[email protected]  ·  WA +86 138 0000 0000  ·  EN · 中文 · VI · TH · MS · ES · RU
HOME / INDUSTRIES / ELECTRONICS CLEANROOM

Electronics Cleanrooms

FFU ceiling grids, ESD flooring and ±2°C/±5%RH control for SMT, assembly and optics — with the FFUs coming off our own line.

CLASS 1K–100KFFU GRIDESD

Where our factory advantage is biggest

  • FFU ceilings from our own line: the single largest cost item in an electronics cleanroom — factory-direct pricing changes the whole project math
  • Class 1,000–100,000 zones with recirculation air walls or FFU+plenum designs, engineered per particle budget
  • ESD package: conductive flooring, grounded stainless furniture, ionization options for static-sensitive assembly
  • Tight climate control: ±2°C / ±5%RH with DX or chilled-water purification AHUs
  • Vietnam-ready: our supervision teams already serve electronics suppliers in Bac Ninh and Hai Phong corridors
Get 48h Engineering Proposal
Electronics cleanroom with FFU ceiling grid installationFFU GRID
Electronics Cleanroom equipment
Electronics Cleanroom equipment
Electronics Cleanroom equipment

Class & FFU coverage reference

CLASSISOFFU CEILING COVERAGETYPICAL USE
1KISO 625–40%Optics, precision assembly
10KISO 710–20%SMT, display modules
100KISO 85–10%General assembly, packing

REFERENCE VALUES — FINAL DESIGN IS ENGINEERED TO YOUR PRODUCT AND AUDIT SCHEME.

Equipment for this industry — from our own line

FFU-grid assembly cleanroom — Class 10K, phased build

Case Study

FFU-grid assembly cleanroom — Class 10K, phased build

READ CASE →
BESTCLEAN chief engineer
CHIEF ENGINEER · 15 YRS · 200+ CLEANROOM PROJECTS

"Send me your floor plan. I'll tell you what it really costs."

Every proposal is reviewed by our chief engineer — not generated by a sales script.

Ask the Engineer

Frequently asked questions

How many FFUs does my room need?

Coverage runs from 5-10% of ceiling area at Class 100K to 25-40% at Class 1K. Send room dimensions and target class — we return an FFU layout and count within 48 hours.

Do you supply ESD flooring and furniture?

Yes — conductive flooring packages and grounded SUS304 benches, trolleys and shelving come from the same factory.

Can you work inside an operating electronics plant?

Yes — night-shift phased construction with temporary partitions is standard practice for line-adjacent builds.

What about Vietnam electronics corridors?

Bac Ninh, Bac Giang and Hai Phong are our most active service areas — Vietnamese-speaking coordination available.

Planning a electronics cleanroom?

Floor plan photo + industry + target class → layout, equipment list and budget in 48 hours. Free.

Start My Proposal
💬 WhatsApp