REPLY < 24H MON–SAT · ISO 14644 · 200+ PROJECTS
[email protected]  ·  WA +86 138 0000 0000  ·  EN · 中文 · VI · TH · MS · ES · RU
HOME / INDUSTRIES / FOOD PROCESSING CLEANROOM

Food Processing Cleanrooms

Class 100,000 production halls, hygiene zoning from raw to ready-to-eat, and washdown-rated stainless lines — engineered to pass the audit your buyer will send.

HACCPCLASS 100KGB 50073

What a food auditor actually checks

  • Zoning: general → quasi-clean → clean production zones with pressure steps and interlocked transfers — we design the personnel/material flow map first, not last
  • Class 100,000 (ISO 8) for inner-packing and RTE cooling rooms; Class 300K for processing halls — per food GMP zoning tables
  • Hygiene line at every entry: lockers → sensor hand-wash → disinfection → boot wash → air shower, all SUS304 washdown-rated
  • Air disinfection during production: AIS ionization units and scheduled ozone cycles for empty-room sanitation
  • Materials that survive washdown: 50mm sandwich panels, coved corners, epoxy floors, IP-rated fittings
Get 48h Engineering Proposal
Food processing clean workshop Class 100000 with epoxy floorCLASS 100K
Food Processing Cleanroom equipment
Food Processing Cleanroom equipment
Food Processing Cleanroom equipment

Typical zoning & class map (food GMP)

ZONEROOMSCLASSKEY EQUIPMENT
GeneralRaw material store, outer packingImpact doors, ozone (scheduled)
Quasi-cleanProcessing, heat treatment300KPurification AC, hygiene line
CleanCooling, inner packing, RTE100K (ISO 8)HEPA outlets, air shower, pass box, AIS

REFERENCE VALUES — FINAL DESIGN IS ENGINEERED TO YOUR PRODUCT AND AUDIT SCHEME.

Equipment for this industry — from our own line

800 m² bakery cleanroom, Vietnam — Class 100K, 32 days

Case Study

800 m² bakery cleanroom, Vietnam — Class 100K, 32 days

READ CASE →
BESTCLEAN chief engineer
CHIEF ENGINEER · 15 YRS · 200+ CLEANROOM PROJECTS

"Send me your floor plan. I'll tell you what it really costs."

Every proposal is reviewed by our chief engineer — not generated by a sales script.

Ask the Engineer

Frequently asked questions

What cleanroom class does a food factory need?

Inner packing and ready-to-eat cooling rooms are typically Class 100,000 (ISO 8); processing halls Class 300,000. We map every room to food GMP zoning tables in the free 48h proposal.

Can you build around an operating production line?

Yes — phased construction and mobile purification AC let us upgrade cleanliness without stopping production; typical changeover per zone is 7-14 days.

Do you provide documents for HACCP audit?

Handover includes third-party particle and microbial test reports plus as-built drawings — the environmental-control evidence HACCP and BRC auditors request.

What does a food cleanroom cost per m²?

Class 100K food cleanrooms typically run USD 120-220 per m² all-in depending on HVAC scope. Send your floor plan for an itemized 48-hour budget.

Planning a food processing cleanroom?

Floor plan photo + industry + target class → layout, equipment list and budget in 48 hours. Free.

Start My Proposal
💬 WhatsApp